• Home
    • About DEA
      • Mission
      • Charter
      • Committee
      • Information Exchange
    • Meetings
      • 2010
      • 2009
      • 2008
      • 2007
      • 2006
      • 2005
      • 2004
      • 2003
      • 2002
    • Projects
      • Completed Projects
      • New Proposals
      • DEA Discussion Items
      • All Presented Projects
    • Members
      • Members
      • Associate Members
    • Links
    • Contact Us

New Proposals (Currently Seeking Funding)

  • DEA-150 – Diminished Drillpipe Capacity Due to Slip Crushing
  • DEA-154 – DGS Technology Dual Gradient Services
  • DEA-155 – A Probabilistic Approach to Risk Assessment of Managed Pressure Drilling Offshore
  • DEA-156 – Smart Shuttle
  • DEA-158 – Development of Self-Expanding Tubular Technology (CFEX©)
  • DEA-159 – Implementing Plug and Play for Computer Controlled Drilling Equipment
  • DEA-160 – Shoulder/Thread Verifier System
  • DEA-161 – A Proposal to Develop an Improved Methodology for Wellbore Stability Predictiona
  • DEA-162 – DeepTrek JIP for Advancing Deep, Hard Rock Drilling Performance through Controlled, Full-scale Laboratory Drilling Experiments with Aggressive Bits and Specialized Fluids
  • DEA-90 Phase IV – Drilling Plastic Shale at Great Depth; A Study to Improve Penetration Rates with Environmentally Acceptable Drilling Fluids
   

Become a Member

Upcoming Meetings

3rd Quarter DEA Meeting, 28 September
4th Quarter DEA Meeting, 18 November

Projects

  • Project Submittal Process
  • Spotting a Good JIP
  • Conducting a Good JIP
  • Conducting Forums

Copyright © 2009 Drilling Engineering Association. All right reserved. Questions regarding this service should be directed to the DEA Webmaster.